Entries by Darren Peck
Published 1 February 2021
In order to provide a better work environment for staff on the project they decided to implement a
Published 21 December 2020
Steel is the world’s most widely used material – but despite technologies existing for
Published 22 January 2018
Mace at the Tottenham Stadium project have devised and implemented an NRMM (Non Road Mobile
Published 22 January 2018
The team at Grosvenor Square are using the Safetard Gel made by Adomast as an alternative mould oil
Published 16 January 2018
The Mace team at Project 696 have introduced weatherproof scaffold wrapping to better protect the
Published 9 January 2018
In the site office, elevation desks were procured to ensure that it is possible for employees to
Published 9 January 2018
Mace have taken a proactive approach to indoor air quality by producing an Air Quality Plan
Published 9 January 2018
The site team used a remote drone (RPAS) for a façade survey to assess its current condition. This
Published 5 January 2018
Mace are driving best practice and as such have been attempting to increase engagement with the CCS
Published 5 January 2018
The site team at Heathrow Terminal 3 used Doka Shuttering systems rather than standard ply
Published 5 January 2018
Plant room fibre glass sheds which were used as external electrical cupboards, were set to be
Published 5 January 2018
The Mace team at Grosvenor Crescent utilised a staff member who had privately certified as an
Published 5 January 2018
The Mace team at Grosvenor Crescent attempted to quantify wellbeing statistically. A wellbeing
Published 5 January 2018
The Mace team at University College London implemented a measure to reduce water consumption whilst
Published 5 January 2018
Utilisation of Monotub DD system of formwork for circular concrete columns to protect the exposed