Entries by Jack Endean
Published 17 August 2020
Creation of an interactive 4D animation that combines the BIM 3D Revit model with the latest
Published 3 August 2020
On this project inline water turbines have been installed on the wastepipes of each handwash
Published 3 August 2020
The company has introduced a site specific video attached to the delivery booking confirmation so
Published 7 July 2020
The project team came up with the idea of organising, in conjunction with the academy’s design
Published 1 June 2020
To improve the communication of both technical and H&S information for the workforce. The
Published 12 May 2020
The complexity of the various project activities creates the need to ensure an operative has a
Published 12 May 2020
The mission room system has been extended by including a real-time point of contact for each team
Published 12 May 2020
Workshops were held on site raising the awareness of autism, extending to the mental health first
Published 12 May 2020
The site has trialled and is now using a bucket dust extractor attachment. This enables
Published 12 May 2020
A clear noise test summary board was devised to communicate the permissible tools to be used at set
Published 12 May 2020
On the A630 College Road Roundabout Junction in Rotherham, the latest MOVA M8 signal control
Published 12 May 2020
The use of a 'Fulmax Booth' has been introduced to promote and meaningfully engage the workforce on
Published 12 May 2020
To reduce single use plastic wastage PHP Building Services are using 300mm long flexible cable ties
Published 12 May 2020
To reduce carbon emissions all company cars are now electric and there has been in-depth research
Published 4 May 2020
The site provides a waterproof ‘dignity bag’ for the homeless around the site which includes