Entries by Jack Endean

CASE STUDY: MOLA – Archaeology and Social History

Published 15 August 2022

MOLA (Museum of London Archaeology) excavated the site of the Boar’s Head, a Jacobean playhouse


Ultra Low Carbon Concrete

Published 11 August 2022

Concrete contributes towards 8% of global CO2 emissions due to the carbon intensive production of


Tower Crane Torquer

Published 11 August 2022

The torquer is a lifting accessory, which allows the user to control suspended loads and the


SESI Soaps

Published 11 August 2022

This contractor has opted to use SESI Soaps for the cleaning and maintaining of site. The


Surfacing Apprentice Scheme

Published 11 August 2022

This contractor has created a Level 2 Apprenticeship scheme working directly with a local


Mobile Waste Compactor Dust Extraction Canopy

Published 11 August 2022

A dust extraction canopy was designed and manufactured for use on site and can be move to other


Truss Ladder

Published 4 August 2022

The Truss ladder is a proprietary piece of equipment that enables a carpenter to work within the


Trimble Vision

Published 4 August 2022

The use of Trimble Vision allows the site team to input modelled building elements and see them


Satellite Internet Connection – Starlink

Published 4 August 2022

The project team had no success in installing a stable good internet connection despite trying all


Pod Point Electric Vehicle Charger

Published 4 August 2022

An Electric Vehicle (EV) charger that can moved moved from site to site without the need for


Medical School Scholarships to Support University Students

Published 4 August 2022

Ahead of the very first intake of medical students to the new School of Medicine, at Ulster


Lotus Pro Ionised Cleaning

Published 4 August 2022

Lotus Pro uses only water to provide a simple, safe and sustainable way to clean. Using an electric


Lake Aeration through Venturi Effect

Published 4 August 2022

In the summer months on this project, the lake has suffered from blue algae which can be deadly to


Fill and Monitor Solution to Construct Highway Embankment

Published 4 August 2022

On this project, part of the road is carried on a 5m high embankment which overlies a historical


Dry Sponge Roller

Published 4 August 2022

This contractor is using the Bowcom Bowdry MK11 which collects up to 60 litres of water per minute,


Back to Previous page

Best Practice Hub
Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible.

Cookies are small pieces of text sent to your web browser by a website you visit. A cookie file is stored in your web browser and allows the site or a third-party to recognise you and make your next visit easier and the website more useful to you.

Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.

We only use cookies to improve your experience and monitor web traffic. All data we collect on this site is anonymous and not shared or sold. Please find more information here

The Best Practice Hub is provided by the Considerate Constructors Scheme